 A. HOW TO      REGISTER/ FAQ 
Please read the information below before completing the    participant admission   application form. 
Why do I need to complete this form? 
Market   Operations (MO)’s is authorized by the Nigerian    electricity Regulatory Commission (NERC) to be the sole operator of the   wholesale    electricity market in Nigeria. One of its responsibilities is to admit and    maintain registers of all market   participants in the wholesale electricity    market. You must complete and submit this form to apply to be a market      participant, if you wish to: 
»  participate in the wholesale electricity market and/or  »  convey any physical   services through the market’s facilities.
If you hold more than one electricity license and intend      to perform different functions pursuant to those licenses in the wholesale electricity    market, you must submit separate   application forms for each function. 
Why has MO developed this form? 
The MO has developed this form to facilitate the    admission of participants into the wholesale   electricity market in accordance    with the market rules. You should read the relevant sections of the market    rules   prior to completing the forms. 
Am I eligible to apply as a market    participant?  
Before the MO can fully admit you as a market    participant, you must satisfy the following   requirements.  »          Hold a valid electricity license or an exemption order    granted or issued, by NERC   »          Fall within one of the classes of persons who may apply    for admission as a market participant (see below):   and  »          Have entered into agreement with the TSP for the use of    the transmission system  »            Have entered into agreement with the relevant DISCO for    the use of the distribution network (embedded GENCOS and   Retailers) 
What classes of persons may apply for    admission? 
The classes of persons   who may apply for admission as    market participant’s are:  »          Generation Licensees  »            Electricity retail licensees  »          Distribution Licensees  »          Persons, other than generation   electricity or    distribution licensees, that have been granted an electricity license by NERC    permitting them to trade   in the wholesale electricity market 
When will I know the outcome of my    application? 
The MO will notify you in writing of the outcome within 5    business days of the receipt of your fully completed   admission form or any    further information or clarification requested by the MO, whichever is the    later (unless you   and the MO have agreed a longer time for this process). If    your application is declined, the notification will inform   why this is the    case. A complete and accurate form will help the MO to process your participant    admission application   within the above stated period. 
Any application processing fees? 
A non-refundable 40%   of License fee is charged as    application processing fee. This is payable to Market Operations Account with    the   following details:-  Bank Name:-  Account No:-  Sort Code:- 
Any security cover required?  
Before your application for admission to start trading in    the wholesale market, is proposed, the MO   must receive your proposal for the    provision of a security cover, pursuant to sections 15.1.4(b) and 15.3.3(a)    of the   market rule.  Note: All communication between the MO   and market    participants shall be in writing. 
  
Technical Information 
- Submission of the technical           information as contained in appendix I and II attached is a condition         for the processing of participant application   for admission.
 
 
- Any draft agreement between         the applicant and TSP or   distribution companies must be attached.
 
 
- Information on metering and           communication system
 
 
  
All meters must be Digital,    COSEM/DLMS compliant, AMR ready   with embedded modem.  
Note: Market Operation shall    require tests to be carried out on   applicant participant’s metering and    communication systems. Successful completion of these tests is a condition    for   admission. 
  
B.FULFILLMENT    OF DUTIES   AND RESPONSIBILITIES: 
-  
- The    Applicant Participant certifies that it   has:                   
- Installed    and proven to be operational the communication equipment required to      communicate with the System Operator for the activities that it proposes to    fulfill, and to comply with the Grid Code; 
 
- Installed    and proven to be operational all metering facilities and communication    equipment (E-mail/Fax)   to communicate with the Market operations; and 
 
- The Bank    Account and transfer mechanism, as required by the   Market Rules for the    market settlement and payment and to comply with the Market Rules; or 
 
- Certifies      that it has installed and proven to be operational all metering facilities    and communication equipment (E-mail/Fax) and   has the Bank Account and    transfer mechanism for the market Rules, settlement and payment, and for the    activities that   it proposes to fulfill, and to comply with the Market Rules    and the Grid Code; or 
 
- Undertakes    to install   prior to acceptance of its Admission Application the facilities    and equipment, and have the Bank Account and transfer   mechanisms described in    (a) to (c) above. 
 
 
 
- The    Applicant Participant further certifies   and agrees that the equipment and    facilities described in paragraph 1 are, or shall be prior to certification,      available for examination, inspection and testing by Market operations. 
 
 
 
 
-  
- For the    purpose of registration, the Applicant Participant attaches the list of    Connection Points,   metering facilities and communication equipment, and a    description of the Bank Account and transfer mechanism is   attached. In the    event that the metering facilities are not yet installed as of the date of    this Admission   Application, a plan and schedule for completion of    installation are attached. 
 
- The Market    operations will   assign a Trading Point and a metering system to each    Connection Point, which will be used to measure the energy that is   injected    or withdrawn by the Participant from the Market. When the registration is    finalized, the Market operations   will give the Participant the list of    Trading Points and metering facilities. 
 
- (Only    if   registering generation) The Applicant Participant attaches the list of power stations, generation    facilities in   each power station and generation capacity of each facility. 
 
- The    Applicant Participant certifies that it   employs on its own behalf, or has    contracted with entities that employ personnel, who are fully qualified and      competent to perform the duties, responsibilities, tasks and functions of the    Applicant Participant under the Market   Rules and the Market Procedures, and    under the Grid Code and the Operating Procedures. The Applicant Participant      agrees that the qualifications of such personnel shall be available to the    System Operator and the Market operations for   review.
 
 
 
 
C.      ADDITIONAL   OBLIGATIONS:   The Applicant Participant agrees to    comply with all terms and conditions of the   Market Rules, the Market    Procedures, the Grid Code and the Operating Procedures, as they may be    modified from time to   time. 
-  
- The    Applicant Participant undertakes that, after registration is confirmed by   the    Market operations, the Participant shall inform the Market operations through    written notification any and all   changes to the information provided on or    attached to this Admission Application form within three (3) Business Days of      the change(s). A change in the Authorized Representative or the Bank Account    for the Market shall be notified   immediately. 
 
- By    submitting this Admission Application, the Applicant Participant shall be    deemed to   agree to abide by the provision of the Market Rules. 
 
- The    Applicant Participant certifies that all   information contained in or attached    to this Admission Application is true and correct, to the best of its    knowledge   and belief. 
 
 
 
 
APPENDIX I 
  
APPLICABLE ONLY TO GENCOS AND    IPPs 
-  
- Technical    data for Applicant Participant’s Generating Unit listing the Generating    Unit’s   fixed electrical parameters.
 
- The    Applicant Participant’s system data, comprising single-line diagrams and   the    electrical parameters relating to the applicant participant’s facilities    connected to the System Operator   Controlled Grid.
 
- The    applicant participant’s load characteristics, providing the estimated    parameters of   load groupings in respect of, for example, harmonic content and    response to frequency deviations.
 
- Data      relating to Reactive Support Service Facilities other than those owned by the    TSP.
 
- Short    circuit in feed   to the System Operator Controlled Grid from the applicant    participant’s system at any connection point.
 
- Maximum    net capacity of the generating unit.
 
- Minimum    synchronization time of the generating   unit.
 
- Minimum level of output for which the    generating unit must, or is scheduled to run.
 
- The      minimum continuous run time of the generating unit, if it is scheduled to    run.
 
- The    minimum continuous   downtime of the generating unit, if it is scheduled to    Desynchronize.
 
- The    maximum ramp-up rate of the   generating unit.
 
- The    maximum ramp-up rate of the generating unit.
 
- The maximum   availability.
 
- The    ancillary service capability.
 
- The    Governor droop; and
 
- Automatic      voltage regulator capability.
 
- Such other details, information and documentation    as may reasonably be   required by the system operator.
 
 
 
 
  
Note:          Market   operations shall require test    to be carried out on applicant participant’s equipment.  Successful completion of these   tests is a    condition for admission. 
  
APPENDIX II 
  
APPLICABLE ONLY TO RETAILERS, DISCOS AND ELIGIBLE    CUSTOMERS 
- Technical    data   for applicant participant’s power transformer(s)
 
- Single    line diagram of applicant participants network,   showing the geographical    locations of all distribution transformers, ring main unit, isolator etc.
 
- List of      injection sub-stations, manned or un-manned and their conditions and    locations.
 
- Load    characteristics of   the area of operation, showing maximum demand, minimum    demand and expected annual load growth rate.
 
- Revenue      generation profile in the past 2 years and expected annual growth rate.
 
- List of    distribution transformers,   showing, serial number, capacities, voltage ratio,    frequency, full load losses and no-load losses.
 
- Percentage    loading of power and distribution transformers 
 
- Customer population according to their      demography, and their expected annual growth rate.
 
- Stock    level of fast moving distribution materials, e.g.   conductors, cables,    transformer oil, fuses, feeder pillars, etc.
 
- Stock    level of equipments, e.g. power   transformers, distribution transformer,    panels, breakers, etc.
 
- List of    metered customers, customers on   direct connections and customers with faulty    meters.
 
- List of    meters in circuit, showing details of   type.
 
 
  
Note: Market    operations shall require that a   physical inspection of the applicant    participant installation and network be carried out.  Successful conduct of this   inspection is a    condition for admission. 
 |